The following is a report written by the construction manager at La Senda Verde, who has taken care of all the construction projects of the year. We would like to thank the donors and volunteers who have made possible to advance in all of these projects.

DECEMBER 2016 – JANUARY 2017

Puma enclosure 10×13.50×10 mts.  at the center and 8 mts. high.

Work: $4,678  Material: $6,100

FEBRUARY 2017

Baby monkey enclosure 6x9x6 mts. second door of 1.5×2.5×2 mts. roof, eating spot and ceiling.

Work: $3,289 Material: $3,874

MARCH 2017

Tapir enclosure 1st. section. Structure, fencing 57mts x 1.15 mts.

Work: 4,500 Material: $1,016

APRIL

Enclosure pool, assembling, perching spot.

Work: $1.023 Material: $1,827

APRIL

Tapir enclosure 2nd. section. Assembly, fencing.

Work: $219 Material: $562

APRIL

Kinkajou enclosure 2nd part. Ceiling and feeding space.

Work: $438 Material: $804

APRIL

Enclosure of 3x6x2 mts. divided in 2 parts

Work: $1,315 Material: $1,242

MAY

Turtle pool 1-2-3 Ceiling.

Work: $146 Material: $169

MAY

Toucan enclosure  6x4x6 divided in 2 parts with a 2nd door of  1.50x2x2 mt.s 2 roofs of 1.50×2.10 feeding and hanging spots.

Work: $1,973 Material: $2,380

MAY – JUNE

Bike washing garage, contention wall, floor, installation of water tank and 1 electric plug.

Work: $1,023 Material: $1,516

MAY – JUNE

Preparation of food, construction of 3 door frams and 6 sliding doors.

Work: $292 Material: $669

JUNE

Tapir enclosure 3rd. section. Assembly, fencing.

Work: $292 Material: $511

JUNE – JULY

Ocelot managing cage 3x6x3 mts. second door, feeding grounds, second floors of 1×2.70x.60 mts. deep.
Work: $1,826 Material: $2,412

JULY – AGUGUST

Ocelot enclosure 6x12x6 mts. 2 scaffolds
Work: $3,289 Materials: $4,538

AUGUST

Maintenance of bridge, gallery, change of wood, painting of structure.
Work: $262 Materials: $511

AUGUST-SEPTEMBER

Tapir pool 3×4.5×1 mts.
Work: $1,461 Material: $849

SEPTEMBER

Bridge of entry to Senda Verde: Cable replacement, entry fence, entry to bike garage, fence of entry.
Work: $731 Material: $1,242

SEPTEMBER

Employee rooms: change of ceiling, steps assembly, metallic structure.
Work: $1,023 Material: $1,608

OCTOBER

Fixing of water intake facility, laying of tubes.
Work: $2,192 Material: $235

OCTOBER – NOVEMBER

Management cage of Jaguar  3x10x3 mts. feeder 2×2 mts. Scaffolds, 3 normal doors, 2 sliding doors, pool of 6×1.20x 1 mts.
Work: $3,216 Material: $3,302

NOVEMBER

Jaguar transportation kennel, 1.50×0.70×0.50 with two sliding doors.
Work: $1,170 Material: $512

NOVEMBER – DECEMBER

Jaguar enclosure 10x20x6 mts.,  2 scaffolds with ramps and 1 door.
Work: $6,140 Material: $8,599

 